boiler, airflow, production, boiler

Summary

The organization has been focusing on the production and development of air distribution and flue gas discharge systems since 1937. After the merger of various production locations, there was a need for a new internal logistics concept within Burgerhout.

Period: Julie 2016 – December 2016

Sector: Plastic production – Airflow

Function: Operational / logistics project leader

Download case study summary [pdf]

Job specifications

A project charter has been drawn up for the assignment with the objective of: A reliable and predictable logistics flow [end-to-end] for the Assen location. Specific measurable criteria have been drawn up for Inbound, Storage, Stock, Outbound and lead times.

Other case study

Production logistics

production, warehouse plastics
datacentre

Technology

boiler, airflow, production, boiler

Plastic production

Transport

energy

Energy

logistics

Logistics

Logistics
fmcg_food

FMCG

FMCG
sharepoint

Sharepoint

Sharepoint